Application of Water Erosion Prediction Project (WEPP) to estimate soil erosion from single storm rainfall events from construction sites

Madhu Pudasaini, Surendra Shrestha and Steven Riley

School of Engineering and Industrial Design, University of Western Sydney, Sydney, NSW, Australia. Email: m.pudasaini@uws.edu.au

Abstract

Soil erosion is a major form of land degradation and has been recognised as a severe environmental problem since late 18th century. Mathematical modelling of soil erosion has been proven to be a cost effective technology to predict soil erosion from different land use practices. The Water Erosion Prediction Project (WEPP) is regarded as one of a new generation of soil erosion models as it is process based and predicts soil erosion at spatial and temporal scales. In addition, WEPP is applicable for hillslopes as well as small watersheds and estimates soil erosion in hourly, monthly or annual timestamps from single storm or multiple storm rainfall events from variety of land use practices.

This paper discusses the application of WEPP to estimate soil erosion from the single storm rainfall event with different soil conditions. Soil erosion is measured from the erosion plot experiments carried out at the University of Western Sydney using large-scale rainfall simulators. Experiments were carried out in dispersive clayey soil and permeable sandy soil with three common land use practices to represent the construction sites in New South Wales. Soil, land use and climate data obtained from the experiment and collected from secondary sources were used as input to the model. Predicted soil loss values were compared with corresponding measured ones. Results obtained from 22 different runs show that WEPP can efficiently estimate soil erosion due to single storm rainfall event from construction sites.

Key Words

Soil erosion, WEPP, modelling, rainfall simulation, construction site

Introduction

The USDA Water Erosion Prediction Project (WEPP) model represents a new generation of erosion prediction technology based on fundamentals of stochastic weather generation, infiltration theory, hydrology, soil physics, plant science, hydraulics and erosion mechanics (Flanagan et al. 1995). WEPP uses steady state sediment continuity equation to estimate soil erosion and deposition in the hill slope and the watershed in hourly, daily, monthly or annual basis from single storm or multiple storm rainfall events from variety of land use practices.

Soil erosion in hillslope is represented as two components in the WEPP model: soil particle detached by raindrop and transported by thin sheet flow, known as interrill erosion component and soil particle detached by shear stress and transported by concentrated flow, known as rill erosion components. The steady state sediment continuity equation used to estimate net detachment in the hillslope is expressed as (Foster et al. 1995):

(1)

where: G=Sediment load (kg/m2/s) at distance x from the origin of hillslope, x=Distance down slope (m), Di=Interrill sediment delivery rate to rill (kg/m2/s) and Df =Rill detachment rate (kg/m2/s). Interrill erosion function of above equation (Di) is given as (Foster et al. 1995):

(2)

where: Kiadj =Adjusted interrill erodibility (kg s/m4), Ie=Effective rainfall intensity (mm/h), σir =Interrill runoff rate (mm/h), SDRRR=Interrill sediment delivery ratio, Fnozzle=Adjustment factor for sprinkler irrigation nozzle impact energy variation, Rs=Rill spacing (m), w=Width of rill (m) and rill erosion function (Df) is given as (Foster et al. 1995):

(3)

where: Kradj = Adjusted soil erodibility parameter (s/m), τf =Flow shear stress (kg/m/s2), τcadj=Adjusted critical shear stress of the rill surface (kg/m/s2) and Tc=Sediment transport capacity of the rill flow (kg/m/s) is given by the relation (Foster et al. 1995;Huang and Bradford 1993)

(4)

where: Ktr = constant parameter, qw= flow discharge per unit width (m2/s)and s = slope (%)

The deposition equation is given as (Foster and Meyer 1972; Foster et al. 1995):

(5)

where: Vf = Effective fall velocity of the sediment (m/s) and βr = Raindrop induced turbulence coefficient (0-1).

Parameters in equations 1 and 5 are normalized with corresponding parameter values of uniform hillslope condition. The equations are then solved to find soil erosion and deposition at particular point of interest at distance x from the top of the hillslope at desired time interval.

Model interface

Figure 1. WEPP Windows Interface.

WEPP software consists of an erosion prediction model (WEPP) written in the FORTRAN programming language, a climate generator program (CLIGEN) also written in the FORTRAN programming language, and a Windows interface (WEPPWIN) written in the Visual C++ programming language (Flanagan and Frankenberger 2002). The interface accesses databases, organizes WEPP and CLIGEN simulations, creates all necessary input files for WEPP and CLIGEN, and executes the FORTRAN models when necessary (Flanagan and Frankenberger 2002). The interface also accesses and processes output information from the FORTRAN models for display and access by the user.

The main Windows interface screen shows a graphical depiction of a hillslope profile, with various areas providing access to input databases and output display (Figure 1). The profile shape is drawn based upon the model slope inputs, which can be accessed through the middle layer on the graphic. Soil information can be accessed through the bottom layer on the graphic, and the cropping/management information through the top profile layer. Climate inputs can be selected or generated through the icon at the top centre of the screen. The horizontal profile length dimensions are provided at the bottom of the screen in either English or metric units.

Construction sites are significant source of sediment and other non point source pollution. Soil erosion from construction sites, without proper soil erosion and sediment control practices can average between 20-200 tones/acre/year, which is 10 to 20 times greater than typical losses from the agricultural land (NRCS 1999). Soil erosion from construction sites thus is more severe in terms of intensity than from agricultural land and degrades land more rapidly.

Different erosion models have been developed in the past to estimate the rate of soil erosion from different landuse practices. USLE, RUSLE, SOILOSS, EPIC, CREAMS and WEPP are few examples. WEPP was developed to overcome spatial and temporal limitation many previous models like USLE and EPIC. However, soil erosion is a natural process influenced by local natural variables, it is essential to evaluate soil erosion prediction models before their application. This study was aimed to evaluate efficiency of WEPP in predicting soil erosion from single storm rainfall events from construction sites in New South Wales so that the model could be use as an alternative tool over existing models.

Methods

Evaluation of WEPP was carried out using the data from the erosion plot experiments carried out at Penrith campus of the university and at Gosford, NSW. The rainfall intensities used in this experiment were chosen to be representative of the low (one year average recurrence interval (ARI)) to medium (five to 10 year ARI) with 30-minute rainfall duration. The intensities were obtained using IFD curves of selected sites published by Engineers Australia (IEAust 1987). Erosion plots of 80m length and 5m width with slope varying between 7% or 8% were used with three land use treatments: Rotary hoed, rolled smooth and topsoil restored. These land use conditions are considered as representative of general construction site conditions in New South Wales, Australia (Pudasaini et al. 2004). Sediment collection troughs and standard RBC flumes (Figure 2) Bos (1991) were installed to collect sediment deposited and to measure runoff from each of the plots.

Figure 2. RBC Flumes.

Large-scale pressure sprays rainfall simulators (Figure 3) calibrated by Farre (2001) were used for the rainfall simulation. Rainfall intensity was measured by placing rain gauges in pre-specified grid across each erosion plot. Discharge was measured in 30 second or one minute interval, manually by reading the water height in the stilling well. Soil samples were collected from three different locations of each plot before and after experimental runs and analysed. Model parameters such as organic matter content, percentage clay, percentage silt, percentage sand, soil albedo and percentage rock fragment were also obtained from the detailed soil analysis data. Sediment concentration in runoff water was estimated from volumetric analysis of runoff water sampled during the experimental run. Sedigraphs and hydrographs were used to estimate total suspended soil from each run. Total soil loss from each run is estimated as sum of suspended soil and sediment deposited in the collection trough.

Climate input file required to run WEPP model was prepared by running stochastic climate generator model CLIGEN included in WEPP model. Date of rainfall, nearest climate station, rainfall duration, measured peak intensity and duration of rainfall were used as input to create climate input file from CLIGEN. Soil input file and slope file were also prepared in same manner using graphical user interface included in the model. Due to the lack of much information about the land use data required to prepare the management file, a suitable management file from the WEPP database that matched the adopted land use condition (rotary hoed, rolled smooth and topsoil restored) was used to run the model. Model outputs were compared with corresponding measured soil loss value obtained from the erosion plot experiment.

Figure 3. Rainfall simulation & erosion plot.

Model Efficiency

A new approach of error estimation (Pudasaini et al. 2004) is introduced to evaluate the efficiency of the model against the measured soil erosion. A perpendicular distance (p) dropped from plotted point of measured versus predicted soil loss (x, y) to a line passing through the origin with slope angle of 45o (OP, Figure 4.) is regarded as error of prediction. This definition is justified because for perfect prediction this distance should be zero. The perpendicular distance (p) thus obtained is normalized with corresponding perpendicular distance from the origin (r). The standard error of prediction (SE) is defined as square root of average of sum of the square of the ratio (p) to (r). Equation 6 gives standard error for (n) data. Value of (SE) ranges from 0 to 1, with the lesser the value the better the prediction.

(6)

and model efficiency (η) is given by the equation:

(7)

which gives the applicability of the model to predict soil erosion.

Results

Model predictions were reasonable for all land use conditions with percentage difference ranging from 49 to –55 for Penrith plots experiments. More difference were observed from Somersby plot experiments and predicted values of soil erosion. This should be because of the lack of detail land management data and use of default values from WEPP database. Table 1 provides the summary of the model output. It shows measured versus predicted soil loss for the particular land use and rainfall condition of each site.

Table 1. Summary of model output and efficiency of the model.

Site Location

Land use
condition

Precipitation
(mm)

Runoff
(mm)

Predicted soil loss
(kg/m2)

Measured soil loss
(kg/m2)

Normalised error
of prediction

Standard
error

Model
Efficiency

Penrith

Rotary Hoed

31.0

24.02

0.384

0.345

0.002862

0.28

0.72

28.0

21.03

0.336

0.268

0.012674

32.0

25.02

0.401

0.363

0.002474

36.0

29.02

0.465

0.467

4.61E-06

Rolled Smooth

14.0

5.50

0.062

0.123

0.108723

33.5

26.65

0.398

0.256

0.047143

26.0

19.16

0.276

0.272

5.33E-05

33.5

26.65

0.398

0.359

0.002654

Top Soil restored

23.6

16.77

0.237

0.315

0.019967

23.1

16.27

0.229

0.309

0.022112

28.4

21.56

0.315

0.520

0.060276

41.0

34.15

0.520

1.083

0.123354

Somersby

Rotary Hoed

25.0

17.08

0.361

0.125

0.235802

25.4

17.48

0.369

0.131

0.226574

38.2

30.26

0.606

0.314

0.100736

37.1

29.16

0.586

0.230

0.190334

Rolled Smooth

38.7

31.22

0.711

0.295

0.170996

43.5

36.02

0.809

0.619

0.017703

Top Soil restored

21.4

13.95

0.341

0.089

0.343448

22.2

14.74

0.359

0.291

0.010944

35.1

27.62

0.637

0.796

0.012312

35.9

28.42

0.653

0.835

0.014961

Standard error of prediction using Equation 6 was estimated to be 0.28 giving model efficiency of 72%. Figure 5. also shows a plot of measured versus predicted soil loss. This scatter plot also shows the relative concentration of plotted points near the line of 45o, showing the reliability of model prediction. As model efficiency of 72% should be regarded as good value, model can be used to predict soil erosion from single storm rainfall events and result can be used in natural resourses conservation and planning. Use of grassed surface as alternative management practice reduced soil erosion from the bare soil by more than 90%.

Conclusion

This study shows a good potential of using WEPP to predict soil erosion from different land use management practices adopted in construction sites from single storm rainfall event. Proper calibration of model parameters is essential to get good prediction result and to reduce standard error of prediction or the model efficiency.

Ackknowledgement

New South Department of Infrastructure Planning and Natural Recourses (DIPNR) had carried out detailed analysis of the soil samples collected during this study.

References

Bos MG (1991) Flow measuring flumes for open channel systems. American Society of Agricultural Engineers.

Farre G (2001) Calibration of Rainfall Simulator, Research Center for Sustainability in Ecological Engineering and Water Resources Technology, University of Western Sydney, Sydney.

Flanagan DC and Frankenberger JR (2002) Water Erosion Prediction Project (WEPP) Windows Interface Tutorial USDA-Agricultural Research Service & Purdue University National Soil Erosion Research Laboratory, West Lafayette, Indiana, USA

Flanagan DC, JCA II, Nicks AD, Nearing MA and Laflen JM (1995) Chapter 1: Overview of the WEPP Erosion Prediction Model In USDA- Water Erosion Prediction Project : Hillslope Profile and Watershed Model Documentation, Vol. NSERL Report No. 10 Eds, Flanagan, D. C. and M. A. Nearing. USDA-ARS national Soil Erosion Research Laboratory.

Foster GR, Flanagan DC, Nearing MA, Lane LJ, Risse LM and Finkner SC (1995) Chapter 11: Hillslope Erosion Component In USDA Water Erosion Prediction Project : Hillslope Profile and Watershed Model Documentation, Vol. NSERL Report No. 10 Eds, Flanagan, D. C. and M. A. Nearing. USDA-ARS national Soil Erosion Research Laboratory.

Foster GR and Meyer LD (1972) A closed-form soil erosion equation for upland areas. In Sedimentation Ed, Shen, H. W. Department of Civil Engineering, Colorado State University, Fort Collins.

IEAust (1987) Australian Rainfall and Runoff: A Guide to Flood Estimation, Institution of Engineers, Australia, Barton, ACT, Vol 1.

Huang C-h and Bradford JM (1993) Analysis of Slope and Runoff Factors Based on the WEPP Erosion Model Soil Science Society of America Journal 57, 1176-1183.

NRCS (1999) Construction Site Soil Erosion and Sediment Control, http://www.il.nrcs.usda.gov/engineer/SoilEro.html

Pudasaini M, Shrestha S and Riley S (2004) Soil erosion control from construction sites: An important aspect of watershed conservation In Self Sustaining Solutions for Streams, Wetlands and Watersheds American Society of Agricultural Engineers, St Paul, MN, USA

Pudasaini M, Shrestha S, Riley S, Henderson L, Geeves G and Pavan N (2004) Efficiencies of management Practices in erosion Control at Construction Sites In Conserving Soil and Water for Society: Sharing Solutions. Proc. 13th International Soil Conservation Organisation Conference Eds, Raine SR, Biggs AJ, Menzies NW, Freebairn DM and Tolmie PE. ASSSI/IECA, Brisbane.